
Ships of the U.S. Navy, 1940-1945
YFD-1 USS Dewey Floating Dry Dock
- Floating Dry Dock:
- Displacement:
- Length:
- Beam:
- Draft: 1
- Speed:
- Armament:
- Complement:
- Built at __________ and commissioned 19__
Scuttled at Mariveles, Bataan on 8 Apr 42 to prevent capture by the Japanese
Additional Links:
-
"Dictionary of American Naval Fighting Ships" -- USS Dewey Floating Dry Dock
Return to
Ships of the U.S. Navy, 1940-45: Yard and District Craft
Return to
Ships of the U.S. Navy, 1940-1945
Last updated:
December 17, 1997